The idea for the Bangalore Namma Metro was conceived in the 2000s. The metro system in Bangalore is also called the Namma Metro (meaning “our metro” in Kannada). Currently, three metro lines—Yellow, Green, and Purple—are operational. Additionally, the Bangalore Metro line traverses the entire city. Construction of three more lines is underway, including the extension of the Green Line. The Bangalore Namma Metro carries approximately 250,000 to 350,000 passengers each month. This has generated significant demand from those seeking to purchase flats in Bangalore.
The Bangalore Namma Metro, nicknamed the Namma Metro, has been an effective prototype that has been a major success for the Bangalore Metro Rail Corporation Limited (BMRCL). The Namma Metro is a major environmental improvement for the city of Bangalore as it significantly helps reduce carbon emissions. It is the first Indian metro rail project to operate on standard gauge using 750V DC third rail traction.
Following the launch of the Bangalore Namma Metro, property prices soared. According to the report, land prices increased by 11% for residential properties and 19% for commercial properties. This represents a percentage of properties within 500 meters of the Namma Metro. Four malls have been built within Namma Metro stations in the past few years: Prestige Falcon City, Mantri Square, One MG Mall, and Brigade Orion. Therefore, the real estate industry has had an economic impact since the arrival of the Namma Metro.
In this blog, you will learn about the Bangalore Namma Metro, the map and timing of the metro lines, the fares for the stations, and much more.
Bangalore Namma Metro: Key Facts
Here are the key facts about the Bangalore Namma Metro:-
- Inaugurated: 20th October 2011
- System: Rapid Transit System
- Owner: Bangalore Metro Rail Corporation Ltd
- Conceptualization: Delhi Metro Rail Corporation (DMRC)
- Active stations: 66
- Train length: 6 coaches
- Timing: 6:00 am to 11:00 pm
Bangalore Namma Metro: Timeline
Here is a timeline of the Bangalore Namma Metro and tentative dates for the upcoming Namma metro:-
| Bangalore Namma Metro | |||||
| Line | Opening date | Last extension | Stations | Terminals | |
| Purple | 20 Oct 2011 | 9 Oct 2023 | 37 | Whitefield | Challaghatta |
| Yellow | 10 August 2025 | – | 16 | Rashtreeya Vidyalaya Road | Bommasandra |
| Green | 1 Mar 2014 | 7 Nov 2024 | 32 | Madavara | Silk Institute |
| Total | 66 | ||||
| Upcoming Lines under Namma Metro Phase 2 | |||||
| Pink | March 2026 (First Phase) | NA | 18 | Kalena Agrahara | Nagawara |
| Blue | September 2026 | NA | 30 | Ctrl Silk Board | KIA Airport |
| Total | 67 | ||||
| Upcoming Lines under Bangalore Metro Phase 3 | |||||
| Orange | Tentative 2028 | -NA- | 22 | JP Nagar Ph4 | Kempapura |
| Silver | -NA- | 9 | Hosahalli | Kadabagere | |
| Red | Tentative 2032 | -NA- | 29 | Hebbal | Sajapura |
Bangalore Metro Route Map
The Bangalore Namma Metro currently has several routes; it serves over 66 operational stations. Some metro lines are under construction, while others are being planned.

Below is a map of the Bangalore Namma Metro, showing active metro lines and station names. Currently, only two lines are operational: the Purple and Green lines.
The map below shows the metro lines under construction—the Red Metro lines proposed for Bangalore City.

Bangalore Namma Metro Lines
At present, two metro lines are in operation in Bangalore Namma Metro and there are more than 66 stations. The two lines are known as the Purple line and the Green line.
Bangalore Metro Purple Line
Let’s take an overview of the Bangalore Namma Metro map – purple lines (Whitefield from Challaghatta) It is: The purple line was launched in the month of October 2011 connecting Baiyyappanahalli to the east to Mysore Road in the southwest. Mysore Road terminal station in the southwest. The line spans a distance of 18.1 kilometers and has 17 stations. Its 4.8 km length is underground in areas such as MG Road, Majestic, and others. The extension was completed in the month of August, 2021 to Mysore Road to Kengeri. Authorities have increased to the Purple Line by two km up to Challaghatta in the month of October 2023, making the purple line operational.

Bangalore Metro Stations on Purple Line
Bangalore Namma Metro purple line from Whitefield to Challaghatta is expected to help homeowners, particularly those who plan to Buy a the flat in Whitefield or Buy a flat in Challaghatta The connectivity has significantly increased, as connectivity has dramatically. Here is the list of Bangalore Namma Metro purple line stations (Whitefield to Challaghatta) These stations:
| Sr. No. | Station Name |
| 1 | Whitefield |
| 2 | Channasandra |
| 3 | Kadugodi |
| 4 | Pattandur Agrahara |
| 5 | Sri Sathya Sai Hospital |
| 6 | Nallurhalli |
| 7 | Kundalahalli |
| 8 | Sitharama Palya |
| 9 | Hoodi Junction |
| 10 | Garudacharapalya |
| 11 | Mahadevapura |
| 12 | Krishnarajapuram |
| 14 | Baiyappanahalli |
| 15 | Swami Vivekananda Road |
| 16 | Indiranagar |
| 17 | Halasuru |
| 18 | Trinity |
| 19 | Mahatma Gandhi Road |
| 20 | Cubbon Park (Sri Chamarajendra Park) |
| 21 | Dr. BR Ambedkar Station (Vidhana Soudha) |
| 22 | Sir M. Visveshwaraya Station, Central College |
| 23 | Nadaprabhu Kempegowda station, Majestic |
| 24 | Krantivira Sangolli Rayanna Railway Station |
| 25 | Madagi Road |
| 26 | Balagangadharanatha Swamiji Station, Hosahalli |
| 27 | Vijayanagara |
| 28 | Attiguppe |
| 29 | Deepanjali Nagara |
| 30 | Mysuru Road |
| 31 | Nayandahalli |
| 32 | Rajarajeshwari Nagar |
| 33 | Jnanabharathi |
| 34 | Pattanagere |
| 35 | Kengeri Bus Terminal |
| 36 | Kengeri |
| 37 | Challaghatta |
Bangalore Metro Green Line
Bangalore Namma Metro Green line was inaugurated in March 2014. It runs from Nagasandra located in northwest, and Anjanapura to the south. The distance between these two locations is 30 kilometers and has 30 stations. Green Line: The Green Line is elevated, just four kilometers long, and has three stations underground.
The Bangalore Namma Metro Line extension between Nagasandra and Madavara was officially opened on 7th November 2024. As the expansion of Namma Metro Green Line becoming operational, the growth in passengers was anticipated to be in the range of 6,500 per day. As a result of the expansion of Bangalore Namma Metro Green Line becoming operational, the growth in passengers was anticipated to be about 6,500 per day. This corridor also increases the demand for housing in areas such as Nagasandra which is where a lot of people prefer to purchase a flat in Nagasandra because of the metro’s accessibility.
Stations on Namma Metro Green Line
| Bangalore Metro Stations Green Line |
| Madavara |
| Chikkabidarakallu |
| Manjunathanagar |
| Nagasandra |
| Dasarahalli |
| Jalahalli |
| Peenya Industry |
| Peenya |
| Goraguntepalya |
| Yeshwanthpur |
| Sandal Soap Factory |
| Mahalakshmi |
| Rajaji Nagar |
| Mahakavi Kuvempu Road |
| Srirampura |
| Sampige Road |
| Nadaprabhu Kempegowda station, Majestic |
| Chickpete |
| Krishna Rajendra Market |
| National College |
| Lalbagh Botanical Garden |
| South End Circle |
| Jayanagar |
| Rashtreeya Vidyalaya Road |
| Banashankari |
| Jaya Prakash Nagar |
| Yelachenahalli |
| Doddakallasandra |
| Konankunte Cross |
| Vajarahalli |
| Talaghattapura |
| Silk Institute |
Bangalore Metro Map of Green Line
Have a better look at Bangalore Namma Metro map of the Green Line:-
Bangalore Metro Yellow Line
The Yellow Line connects RV Road to Bommasandra increasing connections between South Bangalore Namma Metro residential areas and Electronic City. This is attractive to buyers looking to purchase a flat on RV Road, due to the possibility of interchange with other metro lines, and its close proximity to major employment centers.
Overview and Status
| Feature | Details |
| Launch | On August 10, 2025. |
| Route | 19.1-kilometer fully elevated corridor connecting RV Road to Bommasandra. |
| Purpose | Improve connectivity between South Bangalore residential areas and Electronic City. |
| Initial Service | Passenger services began on August 11, 2025, with three train sets operating every 25 minutes. |
New Metro Trains to be Added to Namma Metro for Seamless Services
If you’ve ever traveled by train from Majestic or Indiranagar during peak hours, you know how difficult the Namma Metro can be. However, a significant positive change is coming. The Bangalore Namma Metro is about to undergo a major upgrade, with 96 new trains joining the fleet.
BMRCL has made this decision to reduce waiting times and make your commute less challenging.
The Big Update: 96 New Namma Metro Trains
Currently, the network (approximately 97 kilometers long) operates with 58 trains on the Green or Purple Lines and 6 trains on the newly built Yellow Line. This isn’t enough for a city that’s constantly on the move. Here’s the strategy for new arrivals:
- Immediate boost: Three brand-new trains are scheduled to hit the tracks in June 2026.
- Line-specific splits: 21 new trains are coming to the Green and Purple Lines, and 9 trains are on the Yellow Line.
- Overall goal: BMRCL aims to reduce the frequency between trains to a 4-minute gap. It’s like not having to run to hear the doors closing!
Why the Fleet Expansion Matters
It’s all a matter of math: more trains = more space, and less waiting time.
Dealing with the crowds: The Purple Line (Whitefield to Challaghatta) and Green Line (Madavara to Silk Institute) are notoriously crowded. Trains will ease the stress.
Here’s the Yellow Line factor: As the stretch from RV Road to Bommasandra becomes busier, the new trains will ensure it’s not overcrowded on opening day.
Current Status & Timeline
- Status: Orders have been placed, and the first few sets are in the manufacturing/testing phase.
- First Batch: Keep an eye for them around mid-2026.
- What’s the Vision? BMRCL hopes that the Metro will become the “backbone” to the urban area. With the new trains of 96 they’re certainly moving closer to achieving that goal.
If you commute frequently, 2026 will be a more fluid year. If you own a home and live near a metro station, the property itself will receive a nice “frequency boost.”
frequently asked questions
Ques. What is Bangalore Namma Metro and why is it important?
Ans. Bangalore Namma Metro is the rapid transit system of Bengaluru that helps reduce traffic congestion and provides fast, affordable, and reliable public transportation across the city.
Ques. What are the operating timings of Bangalore Namma Metro in 2026?
Ans. In 2026, Bangalore Namma Metro generally operates from early morning around 5:00 AM until about 11:00 PM, though timings may vary slightly depending on the route and station.
Ques. What new extensions are planned for Bangalore Namma Metro in 2026?
Ans. Several extensions are under development in 2026, including new lines connecting suburban areas, improving connectivity to the airport and expanding the overall metro network.
Ques. Where can I check the Bangalore Namma Metro route map?
Ans. The latest Bangalore Namma Metro route map can be checked on the official metro website, metro stations, or through mobile apps that provide updated routes and station information.